3.During the plan phase, which template is used during the assess and document infrastructure requirements for the proposed solution task?
A: Site Requirements Specification Document
B: IPC Project Plan
C: Staging Plan
D: Vertical Industry Snapshots
E: Operational Assessment Checklist
Correct Answers: A
4.Which activity is associated with documenting trunking requirements for each site within the plan phase?
A: Perform Circuit Gap Analysis
B: Data and Voice Infrastructure Site Survey
C: Conduct Traffic Analysis
D: Document Existing WAN Circuits
E: Circuit Analysis
版权与免责声明
1、本站所发布的文章仅供技术交流参考,本站不主张将其做为决策的依据,浏览者可自愿选择采信与否,本站不对因采信这些信息所产生的任何问题负责。
2、本站部分文章来源于网络,其版权为原权利人所有。由于来源之故,有的文章未能获得作者姓名,署“未知”或“佚名”。对于这些文章,有知悉作者姓名的请告知本站,以便及时署名。如果作者要求删除,我们将予以删除。除此之外本站不再承担其它责任。
3、本站部分文章来源于本站原创,本站拥有所有权利。
4、如对本站发布的信息有异议,请联系我们,经本站确认后,将在三个工作日内做出修改或删除处理。
请参阅权责声明!